We will be delivering an excavator to the Blossom Street site via the new site gates on Shoreditch High Street tomorrow evening (Wednesday 8th May 2019) at approximately 7pm.

We have notified TfL of the planned delivery and have made the necessary precautions to ensure there will be minimal impact to local residents where possible. As soon as the excavator is unloaded onto the site it will be parked up and the engine will be turned off.

Thank you for your cooperation and we apologise for any inconvenience caused. Please do not hesitate to get in touch if you have any queries.